CLIENT: CABOOLTURE SHIRE COUNCIL
2017 - 2018

Construction of; 1700m of 300mm DICL pipe and installation of pump stations at each end of the works with a deep lne running over the edge of a 70m deep quarry finishing on the floor.
Blasting and 18m long rock nails were used to stabilise the rock face are where the pipe was attached. Pumps and electrical were also supplied with this contract.